Archive

Archive for the ‘The Low Grade’ Category

Shenks Ferry

May 30, 2013 1 comment

ShenksFerry_2 copyGreen Hill Road underpass on the Atglen and Susquehanna. This alignment diverges from the Susquehanna Valley heading east toward Quarryville in Southern Lancaster County.

Low Grade | A&S Branch: Moving geographically southeast from Safe harbor on the Atglen & Susquehanna and Columbia & Port Deposit we come to an area know as Shenks Ferry in Conestoga Township. Here the elevation difference becomes readily evident between the two alignments with the A&S running on a high fill diverging from the river valley heading east to Atglen. Along this stretch is the Green Hill Road underpass, a massive masonry tunnel bisecting the high fill and survives as a great example of the engineering undertaken to construct this high volume freight bypass.

PA_Mc Calls Ferry_170191_1912_62500_geoUSGS topographical map circa 1912 of the area around Shenks Ferry. You will note that on the east side of the river where both the A&S Branch and C&PD are located is referred to as Shenks Ferry Station. Also of note is the Pequea Electric Trolley Line that follows the Pequea Creek below Colemanville.

The area was initially documented as being inhabited by European colonists in the early 1800’s, however when Donald Cadzow of the Pennsylvania Historical and Museum Commission excavated a Native American village near Shenks Ferry in the 1930’s he uncovered a civilization that had been lost for almost 400 years. Cadzow had initially thought he had dicovered some unusual Susquehannock artifacts but later realized he had uncovered a new Native American group. This group was given the name the Shenks Ferry People due to the locale of where they were first discovered, but nobody knows what they actually called themselves. Evidence suggests that this site has been used as a hunting camp by different Native American groups for about 4000 years or 2000 years before Christ, it also suggests that the Shenks Ferry culture first appears in this area around 1300 AD. The Shenks Ferry People are identified as pre-historic, which means that there was no written history from the group. Most Native groups, like the Shenks Ferry People, passed their history and culture down orally, so when the last person died this information died with them. It wasn’t until archaeologists began studying their villages that this lost history began to reappear. Still, not much is known about the history of the Shenks Ferry People, nor do we know where they came from. Without a written history of the group all that is known about them is what can be learned from material dug up by archaeologists at their villages.

ShenksFerry_1Alternate view of the Green Hill underpass shows the extensive stone work and size of this underpass, a considerable expense for an unpaved road.

The area later gained its name from the Shenk family who operated a cross-river ferry after colonists like tavern owner Conrad Karer settled here in the early 1800’s. The area was  home to a charcoal briquette plant, iron ore mine and dynamite factory which later provided the PRR much of the needed explosives for excavation of the A&S Branch in the area. Well known locally the dynamite factory exploded on June 9th of 1906, just weeks before the dedication of the A&S killing 11 men and leveling all of the buildings and surrounding woods. The victims of the blast were buried nearby at the Colemanville United Methodist Church in a single casket reflecting the severity of blast and extensive injuries of the victims.

Adj_CONESTOGA-Stoner-dynamite factory beforeDynamite plant near Colemanville, close to Shenks Ferry in Conestoga Township, Pennsylvania. Several weeks before the dedication of the A&S Branch an explosion on June 9, 1906 would claim 11 lives, leveling the entire facility and surrounding woods. The decimation of the casualties was so bad that a single common casket was used for remains of all lost in the tragedy. Collection of the Columbia Historic Preservation Society, Columbia, PA.

Today the area is home to Pennsylvania’s Power and Light’s Shenk’s Ferry Wildflower Preserve an impressive 50 acre sanctuary best known for its extensive variety of spring woodland flowers. PP&L states that the reserve supports more than 70 species that bloom from mid-March until the end of May and another 60 species of flowers that bloom in summer and fall. The former PRR Columbia & Port Deposit or Port Road still operates though the area with most freight restricted to a late night curfew due to its connection with Amtrak’s Northeast Corridor in Perryville and the A&S has been cleared with the intent of connecting to the multi-township  Enola Low-Grade Trail in the future.

Mainline Tour Resumes!

Lancaster. 007Interior detail of the 1929 Lancaster passenger station. Lancaster is the county seat of Lancaster County and was an important junction between the Harrisburg, Portsmouth, Mt Joy and Lancaster Railroad and the Philadelphia and Columbia Railway. After the PRR assumed operations of both railroads, Lancaster remained an important terminal for both passenger and freight operations in the area with many consignees including the large Armstrong Industries facility. 

There is a rich history associated with what became known as the Philadelphia Division of the Pennsylvania Railroad. Starting in the mid 1830’s the State owned Mainline of Public Works would construct a railroad between Philadelphia and Columbia, Pennsylvania connecting to a network of canals that was intended to compete with the Erie Canal. The system was troubled from the start as the advent of the railroad quickly triumphed over the slow, seasonal travel of the canals. The 1846 charter of the Pennsylvania Railroad eliminated any chance of the system succeeding as the new railroad paralleled the canal from Harrisburg to Pittsburgh. Upon arrival at the Ohio River, the young PRR looked to expand from its current terminal points aiming to secure access to lines reaching West as well as to Philadelphia and New York. Initially the PRR had negotiated the right to operate over the Philadelphia and Columbia Railway in 1853 but poor track conditions, a result of the Mainline of Public Works financial distress, presented major limitations.

PRR_Eastern_RegionAt the top of a complicated and dense triangle of heavy freight and passenger traffic funneling west from major costal cities, the Philadelphia Division was the gauntlet that fed traffic to the Middle and Northern Divisions. Map created with help of Elizabeth Timmons.

MAinline_ETTSeeking an alternative to the P&C the PRR surveyed a route in 1853 known as the Lancaster, Lebanon and Pine Grove Railroad, a route that would bypass the P&C all together, creating direct competition while taking away some of the State Works only railroad revenue. Construction however never took place, as the PRR finally purchased the failing Mainline of Public Works in 1857 for $7.5 million. This purchase included the Philadelphia and Columbia Railroad providing exclusive control of the railroad to Philadelphia.

A&S_ETT

Another formative railroad in the evolution of the PRR expansion east from Harrisburg was the Harrisburg, Portsmouth, Mount Joy & Lancaster Railroad. It was chartered in 1837 to connect Harrisburg and Lancaster to the Portsmouth Canal Basin in modern day Middletown. One of its founders and first president was a young James Buchanan who would later become the United State’s 15th President. Indicated by its name, this route provided an attractive connection with the PRR in Harrisburg to the Philadelphia and Columbia Railroad in Lancaster via the new line, eliminating part of slow trip on the P&C. In 1848 the PRR contracted a lease for 20 years, which was later extended to 999 years to operate the HPMtJ&L, making it the first of many independent railroads the PRR would absorb to build its empire.

As the railroad expanded and traffic grew, this mainline network proved to be outdated to meet the needs of the PRR. Extensive rebuilding, expansion, realignment and added infrastructure continued to alter the railroad landscape in bucolic Lancaster County. By the 1880s Chief engineer William H. Brown had begun improving the mainline, expanding the route to the trademark four-track mainline, and replacing lighter bridges with the ubiquitous stone arch bridge he became known for. Though these improvements alleviated congestion, the undulating grades of these alignments, which dated from the formative years of American railroad development, were far from ideal for the future.

Enter PRR President Alexander J. Cassatt who undertook a monumental system improvements project between 1902 and 1906 to eliminate operational bottlenecks and further modernize the PRR network. Cassatt and Brown would begin constructing what Chief Engineer and 3rd PRR President J. Edgar Thompson had envisioned many years before. Building a Low Grade route that provided freight traffic a dedicated right of way free of major grades, obstructions and curvature that would span the system between the Delaware and Susquehanna Rivers, with the intention of going as far east as Colonia, New Jersey as well as a by-pass of the original Mainline into Philadelphia along Darby Creek.

Insets: Route guides based on 1954 Employee Timetables of the PRR Philadelphia Division – adjusted for eastward direction and  annotated to simplify presentation. You will see more of these for better reference and context of other locations as we continue our tour of the Mainline and Low Grade. 

A major piece of the this network was the Atglen and Susquehanna Branch, a two track mainline that ran from a connection with the Northern Central south of Harrisburg, improving upon existing trackage to a location just south of Columbia, where the branch diverged off on what was the largest piece of new construction the PRR had taken on to date. Running across the rolling hills of Southern Lancaster County through cuts and fills, the A&S would connect back to the mainline at Parkesburg continuing on a shared right of way to Thorndale where the routes split yet again, with the Low Grade continuing on the Philadelphia and Thorndale Branch and the Trenton Cut-Off to Morrisville, and the Mainline into Philadelphia via Paoli. Opening in 1906, the A&S thrived for many years providing the capacity the railroad needed to handle the spike in traffic during World War I and II but would later fall prey to the Penn Central merger and subsequent creation of Conrail. As Amtrak inherited the Mainline between Philadelphia and Harrisburg, efforts were made to separate freight and passenger operations on the new railroads, forever changing the PRR network on the Philadelphia Division.

Starting next week we will resume our exploration of both routes, with many new photos, graphics and historical images to tell the story of the evolution of this important division on the Pennsylvania Railroad.

Conestoga River Bridge at Safe Harbor

February 21, 2013 1 comment

York_Haven_Line. 003

Since the construction of the Columbia & Port Deposit Railroad in 1877 trains have operated through Safe Harbor, where the Conestoga River joins the Susquehanna. When construction of the A&S began in 1902 the route was planned to diverge from the Port Road six miles north at Creswell beginning a gentle climb out of the Susquehanna Valley. The first formidable obstacles the PRR would encounter on the new alignment would be the approach and spanning of the Conestoga River Valley. Beginning excavation in 1903 contractor H. S. Kerbaugh converted a former rolling mill in Safe Harbor to provide compressed air to drill pilot holes for blasting in the rock face high above. The dynamite would be hoisted up the cliffs by hand, detonated and the process was repeated. The resulting debris caused the Port Road below to be closed for extended periods of time due to the dangerous conditions, which often buried the right of way.

adj_CONESTOGA-Stoner-blasting rock on SusquehannaBlasting to create the new A&S alignment approaching Safe Harbor. Collection of the Columbia Historic Preservation Society, Columbia, PA.

Perhaps one of the more dramatic locations on the PRR, the new A&S Bridge would stretch 1560’ in length at roughly 100’ higher than the Port Road below. While construction was underway on the new span a flood in 1904 would destroy the Port Road Bridge. Taking advantage of the ongoing construction, engineers decided to incorporate a new crossing on the Port Road, rather than rebuild the existing stone arch bridge. The new span would provide a stronger bridge for the growing freight traffic with the added benefit of increased clearance from the Conestoga River below.

Blog_JD030107Rare view of the original Columbia and Port Deposit Bridge spanning the Conestoga River. This bridge was destroyed by floods in 1904 during the construction of the A&S bridge. It was decided to replace it with a new span rather than rebuild the remains of the stone bridge. Collection of the Lancaster County Historical Society

Chief Engineer, William H. Brown would design the bridges utilizing different style spans to meet the specific needs of each route. The A&S bridge, much longer in length included a 300’ pin connected Pratt deck truss over the river supplemented by plate girder viaducts on steel bents – nine spans measuring 480’ to the north and seventeen spans to south measuring 780’. The bridge would carry two main tracks at height of almost 150 above the creek. Down below on the Port Road, the new bridge would feature 3 riveted deck plate girder spans carrying the two main tracks at a height of 55’ above the 1905 water line.

Adj_MAIN-Stoner-Conestoga Bridge mid progress copy copyConstruction progresses as contractor H. S. Kerbaugh begins the southern approach viaducts. Once the steel erection is complete workers could begin working below on the Port Road bridge. Collection of the Columbia Historic Preservation Society, Columbia, PA.

The steel work for the bridge was fabricated in Steelton by PRR owned subsidiary Pennsylvania Steel and was erected by contractor H.S. Kerbaugh Inc. who had been one of two key contractors during the A&S project. The construction of the masonry piers and retaining walls was unique in that the upper and lower spans shared a monolithic L shaped pier on either side of the river. The piers for the main A&S span went up as the falsework was constructed to support the new 300’ Pratt deck truss, once this was completed, assembly of the approach viaducts proceeded, the northern first then the southern approach. When the majority of the high level erection was completed, contractors could commence work on the lower level Port Road bridge. By July of 1906, trains were running on the A&S and the Port Road, which had suffered from months of closure and restriction due to the construction, would finally resume normal operations later that year in August.

safeharbor.001Modern view of the Safe harbor Hydro-electric power plant during an approaching storm.

In 1930 construction would commence to build the northern most of three Depression Era hydroelectric dams along the Susquehanna River at Safe Harbor. Erected just above the confluence of the Conestoga River the first turbine went online in December of 1931 and by 1940 a total of seven were in operation. Two of these turbines were dedicated to generating the 25 Hz single-phase power required to feed the Pennsylvania Railroad’s newly electrified railroad. By 1938, the final phases of the electrification were complete and included the A&S, Port Road, Columbia branch and mainline west to Harrisburg. With the eastern mainline and freight network complete, power from Safe Harbor began supplying the PRR grid, with tethers of high voltage transmission lines mounted above the tracks, feeding various substations along the PRR’s electrified territory. The railroad understood the value of the Public Works project and the advantage of a renewable energy source. Today Safe Harbor operates 12 turbine generator units and continues to supply the Northeast passenger rail network today.

PRR_ep_proof092View from the Port Road looking to the South. There is a passing siding here that ends just to the north of the Conestoga Bridge, giving the appearance of double track. Most of the Port Road south is single track with passing sidings. The A&S Bridge stands silent today, with no rail activity since 1988.

Turkey Hill

February 14, 2013 5 comments

Turkeyhill.001 copyv2View of Turkey Hill from the north, near Creswell Station, PA.

Turkey Hill, a prominent feature in the local geography along the Susquehanna River became a household name as a result of a resourceful dairy farmer during the Great Depression. Situated on the east side of the Susquehanna River in Manor Township, the hill rises roughly 500 feet above the valley floor. Both the Columbia & Port Deposit and Atglen & Susquehanna routes of the Pennsylvania Railroad make there way around the western face as they move east toward Conestoga Creek at Safe Harbor.

mcfr12nw_cropDetail of a 1912 USGS topographical map of the McCalls Ferry Quadrangle. Notice the distinct notch that Turkey Hill creates off the eastern shore of the Susquehanna River. Collection of Mytopo.com

The name of the family owned Turkey Hill based dairy business dates back several generations to Armor Frey during the Great Depression. Starting as a small supplement to make ends meet, Frey built his dairy route into a profitable company, with his sons taking over in 1947. It wasn’t until the 1980’s however that the name Turkey Hill made it into most of our lives when the Frey family made a considerable investment in growing their ice cream production. By 1981 independent markets in the Philadelphia area picked up the product line and soon after Turkey Hill would be one of America’s best-known dairies.

TurkeyHill_A&SThe former A&S right of way climbing toward Turkey Hill is one of two lines that round the point at different elevations. The Columbia and Port Deposit is at a lower elevation to the right, along the Susquehanna’s east bank. Note the wind turbine in the distance, the absence of the fan blade is due to the longer exposure while the turbine was in motion.

The forward thinking company installed two wind turbines on Turkey Hill in 2010 to provide up to 7.2 kWh or 25% of their facility’s power demands. The towers stand at 262 feet and are the tallest structures in Lancaster County. Ironically the same bluff that Armor Frey allegedly watched the sunrise from everyday before going to work is part of Lancaster County’s Frey Farm Landfill site, a massive facility that handles Lancaster County’s waste that cannot be converted to energy or recycled. While the facility is considerable in size, they have taken great measure to preserve the environmental integrity of the areas rich with wildlife and ornithological diversity. Currently Lancaster County is developing a walk in park and hiking trails to enjoy the breathtaking view from atop of Turkey Hill. Though I have yet to explore this particular location, you can be certain that I will report back with images from this prominent scenic viewpoint!

Creswell Station

February 7, 2013 Leave a comment

portPlate drawing circa 1963 of Port and Cres interlocking, controlled by the operator in Cola tower, which was in Columbia. Interlocking plate collection of The Broad Way.

Just five miles south of Columbia we come to a small village named Creswell Station, the location where the Atglen & Susquehanna Branch diverges from the Columbia & Port Deposit.  By far the longest stretch of new trackage built during the Low Grade project the diverging A&S alignment runs roughly 33 miles from Creswell across Lancaster County to the mainline connection in Parkesburg. South from this junction (railroad east) the C&PD and A&S ran parallel along the Susquehanna as far south as Shenks Ferry with the A&S climbing a gentle .3% grade accumulating a significant difference in elevation between the two routes.

Froio_Bulletin_05

Wide view of Port Interlocking and the Susquehanna River. Note the grade separation with the A&S branch beginning the gentle climb over the Port Road .

Originally controlled locally by an interlocking tower, two remote control points know as Port and Cres were implemented during the 1938 electrification project, controlling a single jump-over arrangement allowing the two lines to intersect with out fouling the opposing main track. Controlled by the operator in Cola tower, this was one of several remote controlled interlocking points along the A&S and C&PD. Port controlled the east and west connections between the A&S and Port Road and was the boundary between the Chesapeake and Philadelphia Divisions. Cres controlled the convergence of the two main tracks to one on the eastern limit of the interlocking on the Port Road. The C&PD to the south/ east of here was all single track with passing and sidings.

PRR. 005A&S jump-over bridge looking east at Port/ Cres interlocking. The track below is the westward main track of the Columbia and Port Deposit branch. Around the bend below is Cres, where this track meets with the eastward main and narrows to one track. Note the transmission poles that are still used to support Amtrak’s feeder line from Safe Harbor to Royalton preserving for now some of the visual characteristics of the original PRR infrastructure.

Creswell Station served as a strategic junction until Conrail abandoned the A&S branch in favor of the Reading mainline in December of 1988. The A&S languished for many years, rusting away until the property was turned over to the local municipalities to create a network of rail trails for the general public. Though the segment from Creswell to Shenks Ferry has yet to be converted, planning has begun to transform this former right of way into a linear park along the beautiful Susquehanna River.

Atglen and Susquehanna Branch

January 31, 2013 4 comments

The Pennsylvania Railroad’s Atglen and Susquehanna Branch was an integral segment of the Low Grade network, a through route dedicated to freight traffic that stretched approximately 140 miles from Morrisville to Enola, bypassing the congestion of Philadelphia and Lancaster.  At a price of nearly $20 million dollars, the A&S Branch spanned Lancaster County creating the final link of this ambitious project. Constructed on earthen fill and etched through the stone hills of the Chester and Susquehanna Valleys the route connected to the Northern Central Railway at Wago Junction continuing east to Parkesburg where it linked back to the mainline. A major piece of this route would include a new 33-mile segment between Cresswell and Parkesburg. To construct the A&S the Pennsylvania Railroad excavated an estimated 22 million yards of earth and rock while building roughly 80 bridges and culverts to create a modern superhighway for freight traffic.  At the time of its dedication on July 27, 1906, the line would be the largest construction project in the railroad’s history to date. Once completed, the A&S and the larger Low Grade would give the PRR an unrivalled route that provided access to all the major port cities the railroad served with a vital link to the four track mainline system west.

A&SGridv3

Highlights of upcoming posts on the PRR’s A&S branch which completed the Low Grade network between Morrisville and Enola. Historical Images included in grid from the (Top row, middle, center row middle) Columbia Historic Preservation Society, Columbia, PA; The Kline Collection, Railroad Museum of Pennsylvania, PHMC (center row, right) and Moores Memorial Library, Christiana, PA (bottom row, left).

During the 1938 electrification project, the A&S and the rest of the Low Grade would see the change from steam to electric locomotives with power coming from the Safe Harbor Hydroelectric Plant located on the Susquehanna River. This early “green” facility not only powered the trains of the A&S but through a tether of high voltage transmission lines along the route, fed major sub-stations along the Mainline and what is know today as the Northeast Corridor. The engineering accomplishment would serve the PRR well through the onslaught of traffic during World War II without major issue, but after the war, traffic would decline sending many railroads into financial crisis. Through bankruptcy and merger the ill-fated Penn Central and subsequent creation of Conrail, the A&S and other parts of the Low Grade would be abandoned in favor of the former Reading route to Harrisburg. On December 19th, 1988 the last freight train would traverse the A&S bringing an end to 82 years of freight service on this remarkable piece of railroad.

MAIN-A&S Topo_small-insert

Map highlighting the A&S Branch from Safe Harbor to Parkesburg.

Since the last train the right of way languished in abandonment, however the transmission lines were retained to continue feeding the substations on the former PRR electrified network. In 2011 Amtrak moved to upgrade the former catenary / transmission line supports with modern mono-poles, while the local municipalities have taken possession of the right of way with some creating a beautiful rail-trail route through the heart of Lancaster County.

Over the next several months we will explore the A&S in detail, looking at the modern remains as well as historical images of the line during construction and operation. I am excited to share a thorough account of an engineering project that speaks to the ability and character of the Pennsylvania Railroad and their claim to being the Standard Railroad of the World!

Columbia, Pennsylvania: 20th Century and the PRR Improvements Project

January 17, 2013 2 comments

By the late 1800’s the Pennsylvania Railroad had developed into a well-heeled transportation system but the rapid growth of industry would necessitate system wide improvements to bring the railroad into the 20th century. In 1902 PRR President Alexander J. Cassatt and Chief Engineer William H. Brown would embark on a series of projects to eliminate bottlenecks and operational problems across the system.

Columbia_Overview_blogv2The area of Columbia along Front Street is host to Cola Interlocking. In this view looking east from the Chestnut Street bridge you can view the eastern limits of expansive interlocking which provides access to the original Philadelphia and Columbia Branch to Lancaster (diverging left) with the original Columbia and Port Deposit (mainline to the right). To the west the PRR would become known as the York Haven line or Enola Branch. Note the 1877 PRR station, which survives along North Second Street.

After the PRR acquired control of the Philadelphia and Columbia Railway through the purchase of the Mainline of Public Works in 1857, various segments were improved during the second half of the 19th century. The route between Philadelphia and Lancaster became an integral part of the PRR mainline connecting with the former Harrisburg & Lancaster creating the line we know today as Amtrak’s Keystone Corridor. The western end of the P&C would become a branch connecting the industrial and agricultural areas of Lancaster and Columbia. Due to the stiff grades both segments were less than ideal for heavy freight traffic. In addition to the P&C property accessing Columbia, the PRR had also gained controlled of the Harrisburg & Lancaster Railroad’s Columbia branch via Royalton and the Columbia & Port Deposit by the mid to late 1800’s, further establishing Columbia as an important railroad hub. Though much of these water level alignments provided a network to move freight to Harrisburg, Cassatt sought to build a new route east from Columbia running across Lancaster County to create a modern freight bypass from New York and Philadelphia to the Harrisburg area and the mainline west.

colaPlate drawing circa1963 Cola Interlocking which controlled the junction of the York Haven line, Columbia branch and Columbia and Port Deposit as well as access to the local freight yard. This interlocking was part of a Centralized Traffic Control system that controlled a much larger district of trackage and interlockings. Collection of The Broad Way.

The Low Grade as it was planned would run right through Columbia using the current alignment. From the east and west new construction would connect existing segments of the H&L and C&PD creating an improved mainline designed to move freight on a new grade separated line. This new route would divert most freight traffic off the mainline all together between Parkesburg and Harrisburg. Enola yard was completed in 1906 as part of the low grade project functioning as the western anchor for all freight trains and motive power between the Philadelphia and Middle Divisions. As a result Columbia importance as a major terminal would diminish due to its close proximity to the new facility, resulting in a significant loss of jobs in the area. Compounded by the diminishing local industry, a result of depleted ore and lumber resources, Columbia’s economy would begin a downward trend that continued through the Great Depression.

Cola.001Cola tower was built in 1938 during the electrification to centralize traffic control on this freight network. Its jurisdiction reached forty miles to the east on the Port Road including the connection to the A&S branch while also controlling tracks to Shocks Mill and Lancaster via the Columbia branch.

More change came on the PRR with the electrification of their network of rail lines in the Northeast.  One of the last segments of the ambitious project was completed in 1938 affording the PRR the benefit of electric traction on the Low Grade, Columbia branch and Columbia & Port Deposit. During the electrification project, the PRR also consolidated many of the early towers with two modern CTC facilities controlling most of this freight network. Cola tower in Columbia controlled all trains on the Columbia Branch to Lancaster, roughly forty miles of the Columbia & Port Deposit Branch including the junction with the A&S Branch at Port and the York Haven Line west to Shocks Mill. Cola’s jurisdiction over the C&PD was unique in that most of the line was actually under control of the Baltimore Dispatcher and was considered part of the Chesapeake Division, while Cola was part of the Philadelphia Division.

Cola.002View looking west from the Columbia Branch near the Mill Street crossing. This is the original Philadelphia & Columbia alignment and is operated by NS to access Lancaster area industries and Dillerville Yard, the center of freight operations in the area. Note the steep descent of the branch, compared to the Low Grade visible to the left, which utilized heavier catenary supports on account of it supporting high voltage transmission lines to Royalton. In typical PRR fashion the Columbia branch was maintained to high standards including the use of catenary to provide a relief route in the event there was wreck on neighboring lines. 

The Low Grade and electrification would survive the Penn Central debacle but ultimately met its demise after the creation of Conrail. Due to the high cost of electric supply charges, the aging infrastructure and the dependency on Amtrak to move trains east of Parkesburg it was decided to abandon an integral part of the system in favor of the neighboring Reading Railroad mainline ending over 80 years of service on perhaps one of Cassatt and Brown’s greatest achievements. The Columbia and Port Deposit survives as Norfolk Southern’s artery to Maryland’s Eastern Shore and the Port of Baltimore. The former P&C to Lancaster provides NS a dedicated connection to Dillerville yard servicing the industrial areas around the seat of Lancaster County. Though not what used to be Columbia still sees a parade of freight daily, though mostly nocturnal, moving freight as Cassatt had envisioned over a century ago.

Columbia Pennsylvania: Early Transportation History

January 10, 2013 1 comment

Columbia_Sta_Detail.v2Modern facade detail of the 1877  Pennsylvania Railroad station in Columbia located along North Front Street.

Columbia Pennsylvania is a town steeped in transportation history, beginning with the area’s settlement led by English Quaker John Wright through the heyday of the Pennsylvania Railroad. Incorporated in 1814 and originally known as Wrights Ferry, settlers aspired to great accomplishments, renaming the town in honor of Christopher Columbus in an effort to entice Congress to select the town as the nation’s capitol. Despite a valuable endorsement by George Washington, Columbia fell just one congressional vote shy of this honorable distinction in 1790. Soon after, in 1812, Columbia lost another bid for distinction when Harrisburg was chosen as the capital of Pennsylvania due to its closer proximity to the Commonwealth’s geographic center.

By 1826 Columbia would be central to various modes of transportation including Wright’s Ferry, and a 5690’covered bridge that provided access to the west bank of the Susquehanna River in Wrightsville. More significant was the construction of a series of canals, establishing Columbia as the eastern terminus of the Mainline of Public Works Project. These canals eased travel to points west such as Pittsburgh, Lake Erie and West Virginia, and provided access to the Susquehanna & Tidewater Canal, opening the way east to Baltimore and other seaboard destinations.

ACDSeePrint Job

PRR in the vicinity of Front and Walnut Streets. Note the passenger station on the right. Date Unkown. Personal collection of Fred Abendschein.

By the 1834 opening of the canal the town also became the western terminus of the Philadelphia and Columbia Railroad, which connected the namesake towns via Lancaster as the eastern extension of the trans-state Public Works. Though the P&C was far more effective than canal travel to the west, poor construction and inadequate equipment would hinder the railroad from operating efficiently. The 1846 charter granted to the Pennsylvania Railroad dealt a major blow to the Mainline of Public Works. By 1857 the growing private venture secured access to Columbia by purchasing the entirety of the system, including the P&C. Its rebuilding of the P&C and later use of canal alignments created a dedicated, all-rail route from Pittsburgh and points west to Philadelphia and New York City.

Wrightsville Bridge Fire

Illustration of the June 28th, 1863 Columbia –Wrightsville Bridge burning during the Civil War from Harper’s Weekly. Collection of  The Civil War

The PRR would serve a major strategic asset to the North during the Civil War, and Columbia would also play a part during the Gettysburg campaign.  As the war raged in Gettysburg, General Robert E. Lee planned to advance Confederate troops east via the Wrightsville – Columbia bridge to take Harrisburg, Lancaster and Philadelphia.  The citizens of Columbia and the State militia burned the vital bridge preventing Lee’s troops from crossing into Lancaster County foiling their attacks. Shortly there after Northern troops would prevail and Columbia would settle into a time of industrial prosperity.

Columbia, Pennsylvania 1894 / drawn by T. M. Fowler.

1894 map of Columbia at the peak of its industrial era by T. M. Fowler. Collection of Library of Congress Geography and Map Division.

The bridge to Wrightsville was rebuilt yet again, and the Philadelphia and Reading Railroad would begin serving Columbia by way of the Reading and Columbia branch. With growing popularity the railroads would seal the fate of the remaining canals that survived hauling coal. Columbia was at the heart of an area rich with iron deposits, now being transported by rail, fostering the rapid expansion of anthracite fired steel and iron forges throughout the Chiques, Conewago and Swatara valleys. Textile mills, lumber and the crossroads of passenger transportation also contributed to local economy. As a new century approached, Columbia had overcome early challenges and the ravages of war to reach its industrial peak, becoming a major railroad hub, host to extensive rail shops and yards, employing hundreds of local residents for both the PRR and Phildelphia and Reading railroads.